Product on sale

Prose V-neck Kit on Sale

$114.50

30 people are viewing this right now
15 products sold in last 17 hours
Selling fast! Over 2 people have this in their carts
  • Check Mark Estimated Delivery : Up to 4 business days
  • Check Mark Free Shipping & Returns : On all orders over $200
  • Visa Card
  • MasterCard
  • American Express
  • Discover Card
  • PayPal
  • Apple Pay
Guaranteed Safe And Secure Checkout

Designed by Julie Hoover

Pullover is worked flat in pieces from the bottom up and sewn together, then neckband is worked from picked-up stitches. Pullover is worked with two strands of C1 Yarn held together throughout for main fabric and one strand of C2 Yarn for edgings only.

 

FINISHED MEASUREMENTS:

Size (1, 2, 3, 4, 5, 6, 7, 8, 9)

37¾ (40¾, 44¼, 47¼, 51, 53¾, 57½, 60¼, 64, 67¾)”

96 (103.5, 112.5, 120, 129.5, 136.5, 146, 153, 162.5, 172) cm

finished bust circumference

Model wearing size 44¼” 112.5 cm with + 10¼” +26 cm ease

YARN:

6 (7, 7, 8, 8, 9, 9, 10, 10, 11) skeins in mYak Baby Camel Sport Weight

1 skein in mYak Kupa Collection Baby Yak | Organic Cotton Light Fingering held single

NEEDLES (not in kit):

Needle A (Main Fabric)

One 24” 60 cm circular needle

3.75 mm US 5 or size needed to obtain gauge listed

Needle B (for Cast On)

One 24” 60 cm circular needle one size smaller than Needle A

3.5 mm US 4

Needle C (for Ribbing)

One 24” 60 cm circular needle two sizes smaller than Needle A

3.25 mm US 3

Needle D (for Neckband)

One 24” 60 cm circular needle three sizes smaller than Needle A

2.75

GAUGE:

22 stitches and 34 rows = 4” 10 cm in stockinette stitch with C1 Yarn held double using Size A needles, after blocking

24 stitches and 38 rows = 4” 10 cm in 2×2 ribbing with C1 Yarn held double using Size C needles, after blocking

Note: The use of a smaller needle for the ribbing fabric is intentional to create a denser fabric. We suggest testing needle size for both ribbing and stockinette stitch gauge.

Color

Gobi / Avalokita, Urban Nature / Melograno

Size

1, 03-Feb, 05-Apr, 07-Jun, 09-Aug, 10